
The project involved developing coordinated BIM models for a residential apartment complex, covering architecture, structure, MEP, RCP, and the building envelope. The models were created to LOD 300 based on the received design drawings and were regularly updated with design changes and clash resolutions. The main objective was to deliver a coordinated reference model and drawings that subcontractors could confidently use during execution.
1. Development of LOD 300 architectural, structural, MEP, RCP, and building envelope models based on received design drawings.
2. Clash detection and coordination across all trades.
3. Regular model updates based on resolved clashes and design changes.
4. Coordination meetings with the client and subcontractors to review issues and align models with site execution standards.
5. Preparation of Builder’s Work Drawings to define service penetrations, openings, and cross-discipline coordination requirements.
6. Generation of coordinated reference shop drawings as the final output of the coordination process."
Connect with us to Streamline your construction process, reduce costs, and improve project efficiency with our expert-driven BIM & VDC solutions. To ensure seamless coordination, minimizing errors and delays, we help you to optimize workflows and maximize project success.