Industrial Facility

Industrial

Highlights

Scale

2,60,000 Sq, Ft.

Client

Contractor

Status

Completed

Overview

Techture developed a 3D BIM model for new steam piping within an existing Steam Plant, using design markups and point cloud data. The scope included integration with existing MEP systems, clash detection, and generation of detailed fabrication and sleeve drawings. RTS points were also extracted to ensure precise on-site installation, all delivered through a Scan to BIM workflow.

Deliverables

1. Develop a 3D BIM model for new steam piping based on design markups.

2. Integrate new piping with existing MEP systems using point cloud data.

3. Coordinate BIM with structural and MEP elements based on site conditions.

4. Performed clash detection and resolved conflicts using PDF and field inputs.

5. Generate fabrication drawings with pipe tags and dimensions.

6. Create sleeve drawings for roof penetrations.

7. Extract RTS (Robotic Total Station) points for precise field layout.

Testimonials

quote-icon

Build Better, Faster

Connect with us to Streamline your construction process, reduce costs, and improve project efficiency with our expert-driven BIM & VDC solutions. To ensure seamless coordination, minimizing errors and delays, we help you to optimize workflows and maximize project success.