Fire Sub-Station

Infrastructural

Highlights

Scale

10,000 Sq. Ft.

Client

Mechanical Contractor

Status

Completed

Overview

This project involved the Mechanical BIM modeling of a 10,000 sq. ft. fire station, delivered to LOD 300. The scope included detailed modeling of HVAC systems from DD stage drawings, coordination with other trades through clash detection and resolution, and incorporation of ongoing design updates. Using Revit and Navisworks, the model was continuously refined to reflect RFIs and site inputs.

Deliverables

1. Develop an LOD 300 Mechanical model incorporating HVAC systems and ductwork.

2. Clash Coordination & Solutions: Identify potential conflicts with other disciplines and implement solutions to ensure efficient integration within the available space.

3. BIM Coordination Meetings: Collaborate with subcontractors to review progress, address clashes, and finalize service alignments.

Testimonials

quote-icon

Build Better, Faster

Connect with us to Streamline your construction process, reduce costs, and improve project efficiency with our expert-driven BIM & VDC solutions. To ensure seamless coordination, minimizing errors and delays, we help you to optimize workflows and maximize project success.