Train Station

Infrastructural

Highlights

Scale

4 Km

Client

General Contractor

Status

Completed

Overview

The project involves the development of LOD 300 models to represent all key disciplines with construction-ready detail. During pre-construction, the GC was actively involved in providing design-assist services, including clash detection and reporting to address conflicts and improve overall project coordination.

Deliverables

1. Develop Architecture & Structure BIM models for 90% CD Stage

2. Develop a Mechanical & Electrical model for 90% CD Stage

3. Develop Roads & Utilities models for 90% CD Stage

4. Clash Detection & Constructability Report Preparation

Testimonials

quote-icon

Build Better, Faster

Connect with us to Streamline your construction process, reduce costs, and improve project efficiency with our expert-driven BIM & VDC solutions. To ensure seamless coordination, minimizing errors and delays, we help you to optimize workflows and maximize project success.