Mumbai Pune Missing Link - Asia's Longest Tunnel Project Completed

Infrastructural

Project Highlights

Scale

8.5 Km

Client

Navayuga Group

Status

Completed

Overview

Techture has been involved in the complete BIM modeling, Quantity Estimation, 4D/5D simulation for the tunnel portion of the Mumbai Pune missing link. It is one of Asia’s longest tunnel with a complete length of 8.5 km along with various cross passages. The project will ensure that the existing six lanes on the stretch are widened into eight lanes.

Deliverables

  • LOD 300 Modelling
  • Creation of BEP
  • MEP Modelling
  • Components modelling of Tunnel
  • Quantity estimation and Material Take Off
  • Clash Detection & Coordination
  • 4D Simulation
  • On-site BIM Coordinator deployment

Build Better, Faster

Connect with us to Streamline your construction process, reduce costs, and improve project efficiency with our expert-driven BIM & VDC solutions. To ensure seamless coordination, minimizing errors and delays, we help you to optimize workflows and maximize project success.