1,76,000 Sq Ft Long-Term Care Facility

Healthcare

Highlights

Scale

1,76,000 Sq. Ft.

Client

Mechanical Contractor

Status

Completed

Overview

This project involved the development of 3D Architectural, Structural, and MEP BIM models to LOD 350 for a long-term care hospital facility. Working from client-provided design drawings, the team collaborated actively with the client throughout model development to ensure all elements aligned with site execution standards.

The scope included multi-trade clash detection and coordination, with detailed clash reports submitted for review and resolution. Drawing production followed the provided sheet list, and all client-approved changes were incorporated promptly to keep the BIM model accurate and fully coordinated across disciplines."

Deliverables

1. Developed LOD 350 BIM models for architecture, structure, and MEP systems based on design drawings.

2. Conducted clash detection and coordination between all trades, submitting detailed clash reports for client review.

3. Integrated client resolutions and design updates into the model to maintain alignment with on-site conditions.

4. Collaborated closely with the client during model progression to ensure compliance with site execution standards.

5. Produced construction drawings in line with the provided sheet list.

6. Incorporated all client resolutions and late-stage design updates into the BIM model to maintain accuracy.

7. Ensured model coordination across architectural, structural, and MEP disciplines."

Testimonials

quote-icon

Build Better, Faster

Connect with us to Streamline your construction process, reduce costs, and improve project efficiency with our expert-driven BIM & VDC solutions. To ensure seamless coordination, minimizing errors and delays, we help you to optimize workflows and maximize project success.