Project Delivery Methods

Sourab Radhakrishnan

Table of Contents

Project delivery methods are approaches or strategies used to plan, design, construct, and manage construction or development projects. The choice of a project delivery method depends on various factors, including project complexity, budget, timeline, and the preferences of the project owner or client.

The following are the most commonly used types of project delivery methods:

1. Design-Bid-Build (DBB)

2. Design-Build (DB)

3. Construction Manager at Risk (CMAR)

4. Integrated Project Delivery (IPD)

5. Public-Private-Partnership (3P)

Design-Bid-Build (DBB)

Design-Bid-Build (DBB) is a traditional project delivery method commonly used in the construction industry. It is a sequential and linear approach to managing construction projects, typically involving three main phases: design, bid, and build. 

Here's an overview of how the DBB process works:

  1. Design Phase:
  • Owner initiates the project and defines the scope, objectives, and requirements.
  • Owner hires an architect or designer to create detailed plans, specifications, and drawings for the project.
  • The design phase includes conceptual design, schematic design, design development, and construction documents.
  • The architect or designer works closely with the owner to refine the design and obtain necessary approvals and permits.
  • Once the design is complete and approved, it is used to create a comprehensive set of construction documents.
  1. Bid Phase:
  • The owner, based on the completed construction documents, seeks competitive bids from contractors to perform the construction work.
  • Contractors review the construction documents and specifications to estimate the project's cost, timeline, and required resources.
  • Contractors submit their bids, which typically include detailed cost breakdowns and proposed schedules.
  • The owner evaluates the bids and selects the contractor with the most competitive bid and suitable qualifications.
  • The selected contractor enters into a contract with the owner, typically a fixed-price contract, to build the project according to the approved design.
  1. Build Phase:
  • With the contract in place, the construction phase begins.
  • The contractor manages the construction process, including subcontractor selection, procurement of materials and equipment, and site management.
  • The project is built according to the approved construction documents and specifications.
  • The owner may have an on-site representative or project manager to oversee the construction progress and ensure compliance with the design and quality standards.
  • Once construction is complete, the project is handed over to the owner, including any required documentation, manuals, and warranties.

Advantages of Design-Bid-Build:

  • Clear separation of design and construction phases, which can be advantageous for owners who want to maintain control over the design process.
  • Competitive bidding process can lead to cost savings as contractors compete for the project.
  • Well-defined plans and specifications help minimize misunderstandings during construction.

Disadvantages of Design-Bid-Build:

  • Lack of contractor involvement in the design phase can limit innovation and value engineering.
  • Potential for conflicts and disputes between the designer and contractor if issues arise during construction.
  • Longer project duration due to the sequential nature of the process.

Design-Build (DB)

Design-Build (DB) is a project delivery method commonly used in the construction and infrastructure development industry. It is an integrated approach that combines the design and construction phases of a project into a single contract or agreement, typically led by a single entity known as the design-builder. This contrasts with the traditional design-bid-build (DBB) approach, where the design and construction phases are separate contracts with different entities.

Here are key features and advantages of the Design-Build (DB) project delivery method:

  1. Single Point of Responsibility: In a DB project, the design-builder is responsible for both the design and construction aspects of the project. This eliminates the need for the owner to coordinate between multiple parties (architects, engineers, contractors) and simplifies project management.
  2. Faster Project Delivery: Because the design and construction processes overlap in a design-build project, it often leads to faster project completion compared to the traditional DBB method. This is particularly advantageous for projects with tight schedules.
  3. Cost Control: Design-build contracts can provide more cost certainty as the design-builder is involved from the early stages of design and can provide input on cost-effective construction methods and materials. This can help prevent cost overruns.
  4. Improved Communication: The close collaboration between the design and construction teams in a design-build project fosters better communication and problem-solving, reducing the likelihood of disputes and changes during construction.
  5. Innovation: Design-build encourages innovation and creative solutions. The design-builder can propose alternative designs and construction methods to optimize the project's functionality, efficiency, and cost-effectiveness.
  6. Quality Control: With a single entity responsible for both design and construction, there is a greater focus on ensuring that the design intent is effectively translated into the final built product, potentially leading to better quality outcomes.
  7. Reduced Administrative Burden: Owners typically have less administrative work when using the DB approach because they deal with one entity rather than multiple consultants and contractors.
  8. Risk Sharing: In some cases, design-build contracts can include provisions for risk-sharing, where the design-builder takes on certain project risks, such as unexpected site conditions or permitting issues.
  9. Customization: Design-build projects can be tailored to suit the specific needs and preferences of the owner, allowing for a more customized and efficient project delivery process.
  10. Single Contract: The owner enters into a single contract with the design-builder, simplifying the contractual relationship and reducing the potential for disputes between different parties.

It's important to note that while design-build has many advantages, it may not be suitable for every project. The choice between design-build and other project delivery methods (such as design-bid-build or construction management) should be based on the project's unique requirements, budget, schedule, and the preferences of the owner. Additionally, the legal and regulatory framework governing design-build contracts can vary by region, so it's essential to understand the local rules and requirements when considering this approach.

Construction Manager at Risk (CMAR)

Construction Manager at Risk (CMAR) is a project delivery method used in the construction industry to manage and complete construction projects. It is also sometimes referred to as Construction Manager as Constructor (CMc) or Construction Manager/General Contractor (CM/GC). CMAR is a variation of the design-build project delivery method and is often chosen for complex or large-scale construction projects. Here's how it works:

  1. Selection of Construction Manager: In a CMAR project, the owner first selects a Construction Manager (CM) through a competitive bidding process. The CM is typically chosen based on qualifications, experience, and other factors, rather than just the lowest bid.
  2. Pre-Construction Phase: After the CM is selected, they become involved in the project during the design phase or even earlier. This early involvement allows the CM to provide valuable input on constructability, cost estimation, scheduling, and other critical factors. The CM works closely with the project's architect and engineers.
  3. Guaranteed Maximum Price (GMP): During the pre-construction phase, the CM works with the design team to develop detailed plans and specifications. They also prepare a Guaranteed Maximum Price (GMP) proposal. The GMP represents the maximum price that the owner will pay for the project, including the CM's fees and all construction costs.
  4. Risk Management: One of the key benefits of CMAR is that the CM assumes a significant portion of the project risk. If costs exceed the GMP due to unforeseen circumstances or changes in project scope, the CM is responsible for covering those additional costs.
  5. Construction Phase: Once the project moves into the construction phase, the CM takes on the role of the general contractor. They hire subcontractors, manage the construction site, and oversee all construction activities.
  6. Collaborative Approach: CMAR promotes a collaborative approach to construction. The CM works closely with the owner, architects, engineers, and subcontractors to ensure that the project stays on track in terms of budget, schedule, and quality.
  7. Quality Control: The CM is responsible for maintaining the quality of work throughout the construction process. They often have a vested interest in delivering a high-quality project since their reputation and fees may be tied to the successful completion of the project within the GMP.
  8. Project Completion: Once construction is complete, and the project meets the owner's requirements, the CMAR project is considered finished. The owner benefits from having a construction professional involved from the early planning stages to ensure the project's success.

The Construction Manager at Risk (CMAR) approach is a project delivery method that combines the expertise of a construction manager with the traditional role of a general contractor. It provides the owner with a high level of involvement and control over the project while shifting some of the construction-related risks to the CM. This method is often chosen for complex and large-scale construction projects where collaboration, cost control, and quality are paramount.

Integrated Project Delivery (IPD)

Integrated Project Delivery (IPD) is a collaborative project delivery approach used in the construction and design industry. It is designed to improve project outcomes by fostering collaboration, teamwork, and shared responsibility among all project stakeholders, including owners, architects, engineers, contractors, and other key participants. IPD seeks to minimize waste, enhance efficiency, and ultimately deliver a higher quality project within budget and on time.

Key principles and features of Integrated Project Delivery include:

  1. Early Collaboration: IPD encourages early involvement of all project stakeholders during the planning and design phases. This helps in bringing diverse expertise to the table and aligning project goals.
  2. Shared Risk and Reward: In an IPD arrangement, project stakeholders share both the risks and rewards of the project. This incentivizes all parties to work together to achieve the project's success.
  3. Common Goals and Objectives: IPD promotes the establishment of common project goals and objectives that all participants agree upon. These goals are typically tied to project quality, cost, and schedule targets.
  4. Open Communication: Effective communication is essential in IPD. All stakeholders are encouraged to openly share information, ideas, and concerns to make informed decisions collectively.
  5. BIM (Building Information Modeling): IPD often utilizes BIM technology to facilitate collaboration and coordination among different disciplines. BIM provides a digital representation of the project, allowing stakeholders to visualize and analyze various aspects before construction begins.
  6. Lean Construction Practices: Lean principles, borrowed from manufacturing, are often integrated into IPD. These principles focus on eliminating waste, optimizing processes, and improving efficiency.
  7. Joint Decision-Making: In IPD, major decisions are made collaboratively, with input from all relevant parties. This ensures that decisions consider the project's overall goals and requirements.
  8. Continuous Improvement: IPD encourages a culture of continuous improvement throughout the project. Lessons learned are used to refine processes and enhance future projects.
  9. Multi-Party Contracts: IPD contracts differ from traditional contracts in that they are designed to promote collaboration and shared responsibility. This may involve a single integrated contract or separate contracts with shared risk and reward provisions.

IPD has gained popularity in the construction industry due to its potential to reduce project delays, cost overruns, and disputes, while also improving the final product's quality. However, implementing IPD requires a high degree of trust, commitment, and effective communication among all project participants. It may not be suitable for all projects, and its success depends on the willingness of stakeholders to embrace a collaborative approach.

Public-Private Partnership (PPP or 3P)

A Public-Private Partnership (PPP or 3P) is a collaborative arrangement between a government or public sector entity and a private sector organization for the purpose of delivering public infrastructure, services, or projects. PPPs are often used when the government lacks the financial resources, expertise, or capacity to undertake a project on its own. These partnerships can take various forms and can be applied to a wide range of sectors, including transportation, healthcare, education, water supply, and more.

Here are some key characteristics and elements of Public-Private Partnerships:

  1. Shared Responsibilities: In a PPP, both the public and private sectors share responsibilities, risks, and rewards. The government typically retains an oversight and regulatory role, while the private sector is responsible for financing, designing, building, operating, and often maintaining the project.
  2. Risk Allocation: One of the primary reasons for forming a PPP is risk sharing. Risks associated with the project, such as construction delays, cost overruns, or revenue fluctuations, are allocated to the party best equipped to manage them. This allocation is usually defined in the PPP contract.
  3. Long-Term Agreements: PPP agreements are typically long-term contracts, often spanning several decades, to allow the private sector partner to recoup its investment and earn a return on its investment. These agreements often include performance-based incentives and penalties.
  4. Funding: The private sector partner often contributes a significant portion of the funding for the project, whether through equity investment or loans. This reduces the financial burden on the public sector.
  5. Output or Performance-Based Payment: In many PPPs, the private sector is paid based on the achievement of specific performance targets or the delivery of defined outputs, rather than simply receiving payments for inputs or services.
  6. Regulation and Oversight: Governments typically maintain regulatory authority and oversight over the project to ensure that public interests are protected and that the private partner adheres to agreed-upon standards and objectives.
  7. Project Types: PPPs can be used for a wide range of projects, including infrastructure development (e.g., roads, bridges, airports), social infrastructure (e.g., hospitals, schools), and public services (e.g., water treatment, waste management).
  8. Global Variations: PPP models vary from country to country and even within regions, depending on legal, economic, and political factors. Different countries have different approaches to structuring and implementing PPPs.

Benefits of PPPs:

  • Access to private sector expertise and innovation.
  • Accelerated project delivery.
  • Efficient risk management and allocation.
  • Cost savings and value for money in some cases.
  • Improved service quality and performance incentives.

Challenges of PPPs:

  • Complex contract negotiations and management.
  • Potential for private sector profit motives to conflict with public interests.
  • Political and public scrutiny of PPPs.
  • Difficulty in accurately estimating long-term costs and benefits.

Public-Private Partnerships have been used successfully in many countries to deliver critical infrastructure and services, but their effectiveness depends on careful planning, transparent governance, and robust contract management. Each PPP should be tailored to the specific needs and circumstances of the project and the region in which it is implemented.

Looking for BIM services for your construction project?
Connect with our BIM experts

Thank you! Your submission has been received!
Oops! Something went wrong while submitting the form.

Looking for BIM services for your construction project?
Connect with our BIM experts

Thank you! Your submission has been received!
Oops! Something went wrong while submitting the form.

Get Latest Techture articles delivered to your inbox.

Sign up for our newsletter.
Thank you for subscribing to our newsletter!
Oops! Something went wrong while submitting the form.

Build Better, Faster

Connect with us to Streamline your construction process, reduce costs, and improve project efficiency with our expert-driven BIM & VDC solutions. To ensure seamless coordination, minimizing errors and delays, we help you to optimize workflows and maximize project success.